Analysis of Labour Productivity and Determining the Parameters Which Affects it in Aluminium Formwork System
Rajnish Singh1, Karthik Nagarajan2, Raju Narwade3
1Raju Narwade, Department of Civil Engineering, HOC College of Engineering and Technology, Rasayani, Panvel, (Maharashtra), India.
2Karthik Nagarajan, Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Panvel, (Maharashtra), India.
3Rajnish Singh Department*, Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Panvel, (Maharashtra), India.

Manuscript received on October 08, 2021. | Revised Manuscript received on October 11, 2021. | Manuscript published on October 30, 2021. | PP: 16-23 | Volume-10 Issue-12, October 2021. | Retrieval Number: 100.1/ijitee.L9552101221 | DOI: 10.35940/ijitee.L9552101221
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The construction industry is considered to be one of the rapidly growing industries of India. So, to fulfil such a vast and constantly increasing construction demand the labour productivity is the key factor to maintain client satisfaction, attract investment, and contribute by helping the nation with its economic growth. Aluminium system formwork is one economical and technical approach to effectively maintain productivity of labours on site. Various research studies have been conducted to compare different types of formwork system and the advantages and disadvantages of each type of formwork system are examined in terms of cost, duration, quality etc. There is no standard procedure to put a number on the efficiency of the site labour, using aluminium formwork system in the industry. So, the primary objective of this study is to find the practical labour productivity in aluminium formwork system and the factors affecting the labour productivity. For this, research is performed on Purva Silversands project, Pune, Maharashtra (Residential Project). Labour productivity and its variations could generate a greater impact on the project economy and project duration. Low productivity can decrease profitability and increases construction cost. This case study shows that the actual productivity observed is less than the target productivity in some of the months, the reasons for variation in target and actual productivity is examined and the factors that hamper the productivity mostly are natural (rain), improper management and any breakdown of machinery. Whereas, the maximum productivity achieved in a month is 10.36 sqm per man per day.
Keywords: Labour productivity, Aluminium Formwork, Conventional Formwork, Factor affecting labour productivity, Mivan.
Scope of the Article: Conventional Formwork