Loading

Handling Solution Tidal Flood in Kaligawe Area by Polder System Drainage
Slamet Imam Wahyudi1, Henny Pratiwi Adi2, Jonathan Lekkerkerk3

1Slamet Imam Wahyudi*, Department of Civil Engineering, Sultan Agung Islamic University, Indonesia.
2Henny Pratiwi Adi, Department of Civil Engineering, Sultan Agung Islamic University, Indonesia.
3Jonathan Lekkerkerk, Department of Water Management, Rotterdam University of Applied Sciences, Netherland.

Manuscript received on November 13, 2019. | Revised Manuscript received on 23 November, 2019. | Manuscript published on December 10, 2019. | PP: 1104-1109 | Volume-9 Issue-2, December 2019. | Retrieval Number: L34501081219/2019©BEIESP | DOI: 10.35940/ijitee.L3450.129219
Open Access | Ethics and Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Kaligawe area is one of the main routes of North Java Coastal traffic and also the gateway of Semarang city from the east. Since more than 5 years this area proned by flooding due to a combination of land subsidence, increasing influence by tidal movement from sea the inability of free flow discharge of river water. In periods of flooding long traffic jams occur for more than 10 kilometers in length. The purpose of this research is to map the flood problem in Kaligawe area, identify the causes of flooding, analyze the technical handling solution and formulate the measures to prevent the flooding in this region. The research method is based on detailed field survey, measurement and observations of water levels, secondary data collection that consist of land subsidence’s, rainfall intensities, tidal elevation. The data are analyzed qualitatively and quantitatively. Among the results of this study is to formulate measures to prevent the number and degree of flooding. These measures can be divided in short, medium term and long term stages. The short term measures consist of construct a temporary weir to regulate water discharge and pump installation including pump strategy. The medium term stage consists of making a polder system, the long term stage consists of spatial sustainability and institutional management of Operation and Maintenance of Polder system. 
Keywords: Flood, Kaligawe Area, Polder System, Tide, Traffic Jams
Scope of the Article: Network Traffic Characterization and Measurements