Effects of Time Laps Affects the Compressive Strength of Cement
Ganesh V. Tapkire1, Hemraj R. Kumavat2
1Prof. Ganesh Vijay Tapkire, Department of Civil Engineering RCPIT Shirpur Tal. Shirpur Dist. Dhule, Maharashtra, India.
2Prof. Hemraj Ramdas Kumavat, Department of Civil Engineering RCPIT Shirpur Tal. Shirpur Dist. Dhule, Maharashtra, India.
Manuscript received on 06 March 2015 | Revised Manuscript received on 26 March 2015 | Manuscript Published on 30 March 2015 | PP: 17-19 | Volume-4 Issue-10, March 2015 | Retrieval Number: J19890341015/15©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)
Abstract: In regular Practice delay in Plastering due to various reasons like material availability, labour recess time, or unskilled labour workmanship due to other activity improper plastering sequence. For usually long delay during plastering the mortar should be kept alive by periodically it keep to mortar workable this study gives the strength data simulating such improper plastering sequence to scope this problem related to improper plastering sequence which ultimately result in formation of joints. And joint portion in regular plastering practice no any other treatment or method can used in ordinary construction method. For this study point of view we prepare the cement cube at laboratory in same manner as per the site condition. And conduct test from this result shows the effects of delay in workmanship and joint affects the strength of cement.
Keywords: Time laps, Mortar Joint, Improper plastering sequence (cement slurry) compressive strength of cement.
Scope of the Article: Composite Materials