Estimating Degradation Factorby Performance Ratio of Rooftop Solar PV Plant
Rajesh Kumar Prakhya1, K.Shashidhar Reddy2, Ch. Lokeshawar Reddy3

1Rajesh Kumar Prakhya, Assoc. Professor, Department of EEE, CVR College of  Engineering,  Hyderabad,  India.

2K. Shashidhar Reddy, Department of  EEE, CVR College of  Engineering,  Hyderabad, India.

3Ch. Lokeshawar Reddy, Assoc. Professor, Department of EEE, CVR College of Engineering, Hyderabad, India. Society’s Group of Institutions-Hyderabad, Telangana, India.

Manuscript received on 20 August 2019 | Revised Manuscript received on 27 August 2019 | Manuscript Published on 31 August 2019 | PP: 616-621 | Volume-8 Issue-9S2 August 2019 | Retrieval Number: I11260789S219/19©BEIESP DOI: 10.35940/ijitee.I1126.0789S219

Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open-access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: This paper diagnostically appraises the debasement thing of the lattice tied housetop daylight based Photovoltaic plant. The impact of rot and plant via and large execution are assessed and dissected for 20kWp sun photograph Voltaic plant appointed on EEE Block housetop in CVR college of Engineering. The debasement appraisal is done bodily from the plant insights separated from internet-interface for the year 2015 and 2016. As an critical boost in this assessment, the plant’s standard typically speakme execution percentage is decided for the two revolutionary years. within the later strengthen the quantity change in the plant standard usually speaking execution Ratio’s are decided. This appraisal widely recognized that corruption of the plant regular by means of and huge execution is high in mid 12 months resulting from prolonged surrounding temperature. The debasement is resolved to be over the pinnacle in may additionally moreover and less in February. The notion procedures in this type of by means of and huge in preferred execution are broke down. inside the wake of considering the results, it is prescribed that plant must be saved up and inspected at intermittent spans for ventured ahead sizeable execution.

Keywords: Degradation Thing, Grid-tied SPV Plant, Panel Corruption, , Overall Performance Ratio (PR),overall Performance Metrics, sun Insolation, System Performance.
Scope of the Article: System Integration