Loading

Wind Energy Conversion System and Solar Pv Integration
V. Jayakumar1, D.C. Kumaresan2, R. Karthikeyan3

1V.Jaya Kumar, AP, Department of EEE, M. Kumarasamy College of Engineering, Karur (Tamil Nadu), India.
2D.C. Kumaresan, Proffers, Department of EEE, M. Kumarasamy College of Engineering, Karur (Tamil Nadu), India.
3R.Karthikeyan, Proffers, Department of EEE, M. Kumarasamy College of Engineering, Karur (Tamil Nadu), India
Manuscript received on 01 May 2019 | Revised Manuscript received on 15 May 2019 | Manuscript published on 30 May 2019 | PP: 1595-1600 | Volume-8 Issue-7, May 2019 | Retrieval Number: G6084058719/19©BEIESP
Open Access | Ethics and Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: As the requirement of Electricity is growing day by day and is already over the assembly of Electricity whereas reserves of fossil-fuel are depleting, there’s a powerful have to be compelled to shift for different sources that are renewable energy sources. Concerning this, AC small grids and their energy management of those renewable energy sources have gained a lot of importance that is mentioned during this system. The most objective of the planned system is making uninterrupted power supply to the load systems that are settled at isolated sites of remote and rural areas. The planned system in the main deals with implementation of Energy Management System (EMS) to AC small grid exploitation most outlet chase (MPPT) algorithmic rule [3]. An organized and multivariable EMS is arranged that utilizes a turbine and an electrical marvel cluster as manageable generators by changing the pitch point and consequently the move obligation cycles and a capacity framework comprising of batteries. In order to comprehend steady current, consistent voltage (IU) charging routine and increment the lifetime of batteries, the arranged EMS need being a ton of flexible with the capacity abridgement highlight. The arranged procedure is created as a web nonlinear model prognostic administration (NMPC) algorithmic standard upheld individual MPPTs of the framework. The complete designed system is modelled and simulated exploitation MATLAB/Simulink design. And also hardware implemented by Arduino based controlled design
Keyword: Battery Management, Maximum Power Point Tracking (MPPT), Nonlinear Model Predictive Control (NMPC), Power Sharing, and Voltage Regulation.
Scope of the Article: System Integration.