A Pre-Test via Partial Least Square Structural Equation Modeling with the Influence of Organisational Structures and Organisational Internal Factors on Construction Risk Management Among Malaysian Construction Industries
Manal Suliman Omer1, A.Q. Adeleke2, Chia Kuang Lee3

1Manal Suliman Omer, Faculty of Industrial Management, University Malaysia Pahang, Lebuhraya Tun Razak, Gambang, Darul Makmur Kuantan, Pahang Malaysia.

2A.Q. Adeleke, Faculty of Industrial Management, University Malaysia Pahang, Lebuhraya Tun Razak, Gambang, Darul Makmur Kuantan, Pahang Malaysia.

3Chia Kuang Lee, Faculty of Industrial Management, University Malaysia Pahang, Lebuhraya Tun Razak, Gambang, Darul Makmur Kuantan, Pahang Malaysia.

Manuscript received on 08 April 2019 | Revised Manuscript received on 15 April 2019 | Manuscript Published on 26 July 2019 | PP: 402-406 | Volume-8 Issue-6S4 April 2019 | Retrieval Number: F10810486S419/19©BEIESP | DOI: 10.35940/ijitee.F1081.0486S419

Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open-access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: An increased demand has been placed on construction projects to be more accountable to their clients with measure to the company services and outputs. This demand is because of innumerable antecedent factors repelling risk management in construction projects. However, finishing the projects is not only the concern of the industries but also managing the risks involved with the projects. This paper investigated the effects of organizational structure and internal factors on the risk management among G7 contractors in Malaysia. The purpose of this study is threefold: (i) to propose an inclusive research model which comprises of the antecedent factors proposed in the model to improve effective risk management in Malaysia construction industries (ii) to serve as a validation process for the developed instrument of the on-going research with the identified constructs of the study (iii) to show the preliminary analysis and the results. A pilot study was conducted, data was collected and a total of thirty (30) respondents’ responses were analysed using a questionnaire of eighty-one items. This was conducted to access and validate how reliable the analytical tools (i.e PLS-SEM model) used in the survey were. The results obtained indicated that the reliability of the measurement model and the ensuing data for pilot study suggested a veritable evidence of their validity.

Keywords: Construction, Coercive, Risk Management, Instrument, Reliability Assessment, and Validity Assessment.
Scope of the Article: Industrial Engineering