Construction Material Waste Management on Building Development Projects in Makassar City
Irwan Ridwan Rahim1, Suharman Hamzah2, Irmawaty3

1Irwan Ridwan Rahim, Department of Environmental Engineering, Faculty of Engineering, Tamalanrea, Makassar, Indonesia.

2Suharman Hamzah, Department of Environmental Engineering, Faculty of Engineering, Tamalanrea, Makassar, Indonesia.

3Irmawaty, Department of Environmental Engineering, Faculty of Engineering, Tamalanrea, Makassar, Indonesia.

Manuscript received on 01 February 2019 | Revised Manuscript received on 07 February 2019 | Manuscript Published on 13 February 2019 | PP: 18-20 | Volume-8 Issue- 4S February 2019 | Retrieval Number: DS2823028419/2019©BEIESP

Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open-access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: To overcome the problems caused by material waste, a method is needed to minimize the emergence of material waste, so that the implementation of a project can increase profits in terms of time, cost and environmental quality improvement. Thus, in this work, construction material waste management on building development projects in Makassar city was done. The objective of this work is to analyze the type of waste material that is dominant in building projects, analyze the dominant factors that cause waste material to occur in building projects, analyze ways to minimize waste material and handle waste material in building projects. Results showed that for construction of a building project in Makassar for consumable materials, volume of iron, light brick and ceramics occupy the highest order with a volume of around 6-10%.

Keywords: Building Development, Construction, Material waste, Waste Management.
Scope of the Article: Building and Environmental Acoustics