Loading

Optimization of Mould Base Production using Ranked Positional Weighted Method and Single Minute Exchange of Die System
Arun A P1, Dhamotharan S2, Karthikeyan S3, Rajini N4

1Arun A P, Department of Mechanical Engineering, Kumaraguru College of Technology, Coimbatore (Tamil Nadu), India.

2Dhamotharan S, Department of Mechanical Engineering, Kumaraguru College of Technology, Coimbatore (Tamil Nadu), India.

3Karthikeyan S, Department of Automobile Engineering, Kalasalingam Academy of Research and Education, Virudhunagar (Tamil Nadu), India.

4Rajini N, Department of Mechanical Engineering, Kalasalingam Academy of Research and Education, Virudhunagar (Tamil Nadu), India.

Manuscript received on 03 December 2019 | Revised Manuscript received on 15 December 2019 | Manuscript Published on 30 December 2019 | PP: 334-339 | Volume-9 Issue-2S2 December 2019 | Retrieval Number: B10491292S219/2019©BEIESP | DOI: 10.35940/ijitee.B1049.1292S219

Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open-access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: In the domain of intense global competition, the manufacturers are in need of producing different varieties of products. Successful manufacturing firms in the past have well produced the products based on the minimum amount of requirements in the market. This is so because of customer needs and economy rate is minimum in the past period of time. People like to use molded parts instead of using assembled component in the present days to survey in the market against competitors. So the manufacturer decides to produce a wide variety of mould bases for production and to satisfy the market needs. But the mould base manufacturing is not easier to produce the components to reach the market. It ought to be very much precised and devours more opportunity to produce the component by manufacturer to deliver that in an on-time to market. For this situation, the enterprise which produces distinctive mould bases needs to reduce the lead time is the major fundamental worry of the work. The primary target of this work is to decrease the setup time from 30 minutes to less than 20 minutes for each component. This cannot be accomplished without huge investment and to be versatile for manufacturing different mould parts. This needs special planning to manufacture different moulds. And the result obtained with the help of using Ranked Positional Weighted (RPW) method procedure for an entire operation to calculate the critical path of production of components and also use the Single Minute Exchange Die (SMED) to optimize the setup time in an operation. Results of the research signifies the application of ranking an operation with suitable methodological approach to reduce the cycle time of the production of component to satisfy the market needs.

Keywords: RPW Method, Single Minute Exchange Die (SMED), Cycle Time, Lead Time.