Critical path through Interval valued Hexagonal Fuzzy Number
Ghousia Begum S1, N. Jose Parvin Praveena2, A. Rajkumar3

1Ghousia Begum S , Research scholar, Mathematics Department/ Hindustan Institute of technology and science, Chennai, India
2N. Jose Parvin Praveena, Assistant Professor, St. Joseph’s College of Engineering, OMR, Semmenchery, Chennai, India
3A.Rajkumar, Mathematics Department, Hindustan Institute of technology and science, Chennai, India

Manuscript received on 23 August 2019. | Revised Manuscript received on 19 September 2019. | Manuscript published on 30 September 2019. | PP: 1190-1193 | Volume-8 Issue-11, September 2019. | Retrieval Number: J92900881019/2019©BEIESP | DOI: 10.35940/ijitee.J9290.0981119
Open Access | Ethics and Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: This critical path method is very useful method in the project network to succeed the multifaceted jobs. The main benefit of this technique is to decrease the completion time of the jobs. In this paper the Interval valued Hexagonal fuzzy number is applied to determine the critical path. The procedure for critical path method is described. Finally Numerical example is presented.
Keywords: Critical Method, Hexagonal fuzzy number, Shortest Path, Floats.
Scope of the Article: Fuzzy Logics