Loading

Risk Management on Design Works in Malaysia
Zul Zakiyuddin Ahmad Rashid1, Hamimah Adnan2, Norazian Mohd Yusuwan3, Nor Azmi Bakhary4

1Zul Zakiyuddin Ahmad Rashid, School of Housing, Building and Planning, University Sains Malaysia.

2Hamimah Adnan, Faculty of Architecture, Planning and Surveying, University Technology MARA, Shah Alam, Selangor, Malaysia. 

3Norazian Mohd Yusuwan, Faculty of Architecture, Planning and Surveying, University Technology MARA, Shah Alam, Selangor, Malaysia.

4Nor Azmi Bakhary, Faculty of Civil Engineering, Universiti Teknologi MARA, Shah Alam, Selangor, Malaysia.

Manuscript received on 03 February 2019 | Revised Manuscript received on 10 February 2019 | Manuscript Published on 22 March 2019 | PP: 96-104 | Volume-8 Issue-5S April 2019 | Retrieval Number: ES3401018319/19©BEIESP

Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open-access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Construction project is shrouded with various aspects of risks related to design professionals and design works. The parties involved must be able to manage the risks to complete a construction project successfully. This study aims to assess factors, associated with design professionals and design works, under the traditional procurement route in Malaysia. The study has also investigated the role of Malaysian law in corresponding to the practices of standard risk management by the parties involved. An in-depth, semi-structured interview was applied to gather the information from practitioners involved in design for more than 10 years. The findings showed that the level of understanding among the respondents can be improved. Several aspects of the law of contract, tort, and statutory provisions have to be addressed to correspond to design risk management needs. The law has been considered as an efficient force in ensuring proper risk management practice among the designers. The lack of effort undermined the crucial role of the law itself. It was found out that there are certain aspects of the law that are not being fully understood by the respondents; therefore, this factor also leads to the occurrence of design related risks.

Keywords: Construction, Design Risk, Law, Risk Management.
Scope of the Article: Computational Techniques in Civil Engineering