Analysing Delays of Construction Projects in Western Part of Mumbai: Causes and Effects
Sandeep V. Gujjar1, Soham Sawant2, Ashish P. Kulkarni3, Chaitali R. Kulkarni4, Shivani G. Khabale5, Usha N. Mane6, Anand M. Hunashyal7

1Sandeep V. Gujjar, Assistant Professor, Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Dist. Raigad, Maharashtra, India.
2Soham Sawant, Department of Civil and Infrastructure Engineering, Rustomjee Academy for Global Careers, Dahanu road (E), Maharashtra, India affiliated to University of Wolverhampton, UK.
3Ashish Kulkarni, Department of Construction Project Management, Pillai HOC College of Engineering and Technology, Rasayani, Dist. Raigad, Maharashtra, India.
4Chaitali R., Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Dist. Raigad, Maharashtra, India.
5Shivani G. Khabale, Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Dist. Raigad, Maharashtra, India.
6Usha N. Mane, Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Dist. Raigad, Maharashtra, India.
7Dr. Anand. M. Hunashyal, Associate Professor, Department of Civil Engineering, Visvesvaraya Technological University, KLE Institute of Technology, Hubballi, Karnataka, India.
Manuscript received on February 10, 2020. | Revised Manuscript received on February 24, 2020. | Manuscript published on March 10, 2020. | PP: 823-836 | Volume-9 Issue-5, March 2020. | Retrieval Number: E2609039520/2020©BEIESP | DOI: 10.35940/ijitee.E2609.039520
Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Construction is one of the most important employment sectors in India with very minimal research being done to identify the delay factors and causes that affect the construction Industry. The opinions of the construction professional required for the research was obtained by conduction interviews. A set of questions were circulated between the professionals working on the site to acquire the causes and effects of delays faced by them. To resolve the issues various studies and researches have been done by various researchers. The data analyzed in the research was done by using Relative Important Index (RII) which helpsto categories and rank the causes of delays according to the importance of the causes with respect to its contribution towards time delays, arbitration, litigation, cost overrun and total abandonment. Spearmen’s rank correlation coefficient was used compare the effect of delays between contractors, owners and consultants. In this paper, the research is aimed towards finding the effects of various causes on the various parties on construction sites of coastal parts of Mumbai and methods of minimization of the same. 
Keywords: Construction Delays, Relative Important Index, Spearmen’s rank Correlation Coefficient, ANOVA
Scope of the Article: Construction Economics